The use of well-established and systematic mine planning procedures enables more detailed studies to be undertaken in the same or less time and at lower cost than alternative more labour-intensive, less systematic methods.
Geosun's experienced mine planners can expertly operate the major mine planning systems to produce short and long term pit excavation designs, schedule block layouts, dump designs, and volume balancing.
Resources and reserves are generated as precursors to mining feasibility studies and the assessment of quality, product types and potentialmarkets.
The 2004 JORC code provides minimum standards for public reporting of mining reserves to the international investment community. Geosun's engineers regularly apply JORC standards (US - SEC Industry Guide 7, Canadian - National Instrument 43-101, NRFC) to their work and fulfil the competency-based requirements outlined in the code.